Tuesday, 26 August 2014

Surrey Heath Local Committee mtg: Thu 3rd July: Follow up (26th Aug)

Nicola (Surrey Heath Local committee) responded with minutes from the July 3rd meeting:
Tue 19th Aug  (from: nicola.thorntonbryar@surreycc.gov.uk)

The minutes are completed and are attached.

I have posted these onto our website - but there is a problem at the moment as none of our local committee papers are being displayed - IT are looking to resolve the problem.

I have been in touch with both Andrew Milne and the Countryside access team, to chase up the report and costings, which we can then discuss at our next Committee meeting on 3rd October.  If the committee agree that funding this work is a priority for them, then it will need to be funded from the 2015/16 highways budget...

The links to the meeting minutes are below. I can't see Annex B (where committee responded to my question), so I've had to share it out below:
 - All Surrey Heath Meetings Minutes

 - 3 Jul 2014 6.30 pm - Agenda, Decisions, Draft Minutes
  - Annex B (response from committee)

My original question to the committee, and their response is repeated below:


Q. Written question from Mr Jon McClelland, Local Resident

The Hatches path, officially referred to as Bridleway BW19 by the Countryside Access Team, is long overdue maintenance. The path is overgrown on each side and is now a narrow strip of tarmac, much of which is badly potholed. In winter the path is muddy and flooded making it very difficult for pedestrians & cyclists to navigate.

Many people would like to see the path properly tarmacked across the full width of the path (approx 7-9 feet) and treated as a "Shared Use route for Pedestrians & Cyclists". I have started a blog and petition to raise awareness of this, which has 89 signatures to date. I expect more signatures as conditions get worse in the autumn.

I have been in correspondence with Luke Dawson of the Countryside Access Team who has visited the path and confirmed it needs maintenance work carried out. He has requested funds "from a bigger pot" to fund improvement works but was unsuccessful this year. He has investigated interim solutions to fix the worst of the potholes and improve drainage. He also suggested "a scrape of the surface mud to allow the full available width". I noticed this was done recently (by Mon 23rd June) but this has only cleared the existing 4 foot wide path. Potholes still need to be fixed and drainage improved.

My blog has full details of my discussions with the Countryside Access Team and sustrans. I will also update with the committee's feedback. Thank you for your time".

The question:

Can the committee help the Countryside Access Team with funding to upgrade the path properly to a Shared use route for Pedestrians & Cyclists?


A.    Response from Chairman on behalf of the Committee:

The Countryside access team have been working with Mr McClelland on this issue and initial remedial work has taken place as mentioned above.  The team are working with Highways officers and the cycle strategy group to provide options and costings for the committee to consider. 

A report will be produced for the next meeting.
The next meeting is on Thu 2nd Oct so we'll hopefully have some interesting feedback from the Countryside Access Team by then.





Wednesday, 13 August 2014

Surrey Heath Local Committee mtg: Thu 3rd July: Follow up (13th Aug)

Further to my previous follow up, I received this email from Nicola (Surrey Heath Local committee)
Tue 22nd July  (from: nicola.thorntonbryar@surreycc.gov.uk)

I was pleased that you were able to attend the Local Committee and hear the response to your written question...

The minutes will be posted on line once completed, together with the notes of the public questions and the answers to written questions - I will let you know as soon as this is posted...
Meanwhile, Luke Dawson responded a few weeks later...
Thu 31st July  (from: luke.dawson@surreycc.gov.uk)

Thank you for your email, my usual response time has been delayed further by the current warm weather which is causing a lot of overgrowth on the Public Rights of Way in my management area. So please accept my apologies for the delay. I have scheduled a meeting with a contractor next week to discuss what remedial works are required. I hope the works can be carried out soon after, depending on the agreement of any affected parties. 

If you would like to discuss this more over the phone, please do not hesitate to contact me.

 ...I responded with this...
Thu 31st July  (from: luke.dawson@surreycc.gov.uk)

Thanks for your email. Yes, it must be a busy time of year for you guys! I gave you a quick call but it went to VM. I'll try again later or if you get a chance could you call me?

It would be good to have the grass verges cut back as far as the tarmac goes. The other big improvement would be to patch the worst of the potholes (near middle of path where I've put up a petition sign).

 ...and Luke called me shortly afterwards. Luke told me he was visiting the site with an inspector w/b 11th Aug. We discussed the funding issues, etc. He said the CAT work with a small budget and also ask volunteers to help out with some projects. I said I'd like to see what funding the Surrey County Council were prepared to help with and then no help if forth coming we may need to resort to volunteers doing the work ;0\

It's now Wed 13th Aug and I haven't heard anything further from the council, or Luke. I'll chase them again tomorrow...

Wednesday, 16 July 2014

Surrey Heath Local Committee mtg: Thu 3rd July: Follow up (16th July)

I attended the Surrey Heath Local Committee meeting on Thu 3rd July. The Agenda & decisions are now published:

http://mycouncil.surreycc.gov.uk/ieListDocuments.aspx?CId=144&MId=2891&Ver=4

My question is shown in section 4 (Written Public questions), but there is no public response to the question (as yet).

During the meeting, my question was read out and the chairman, David Ivison, said he had taken a walk along the path the previous day and didn't notice any potholes. I then spoke for a minute, asking the committee to confirm what support they can give to improving the condition of the Hatches path (aka Bridleway BW19). I also suggested to David that he re-try his walk in the autumn after it had been raining. The committee confirmed they will follow up on my question off-line after the meeting.

Previous to the decisions being published, I sent the following emails. First to Luke Dawson (Countryside Access Team) :

Wed 9th July (to: luke.dawson@surreycc.gov.uk)
Since we last spoke I wonder have you heard anything about any temporary improvements you guys can make to the path?  Would it be possible to have the grass verges cut back to reveal as much tarmac underneath as possible? I think the path would be much wider if so.

The main improvement after that would be to have the worst of the potholes filled in and/or drainage improved, ready for the autumn rains.

It would be good to have a quick chat sometime about the possible improvements that can be made ranging from temporary to a fully resurfaced path ;0)

...and referenced the above in this email to the committee:
Wed 9th July (to: david.ivison@surreycc.gov.uk & nicola.thorntonbryar@surreycc.gov.uk; cc: chris.pitt@surreycc.gov.uk)
David & Nicola,

Thank you for adding my question about the condition of Hatches Path on the agenda of thecommittee meeting on 3rd July (http://mycouncil.surreycc.gov.uk/mgMeetingAttendance.aspx?ID=2891). I should point out that the wording of my petition "to upgrade" the Hatches Bridleway, is unfortunately misleading. Some people would think this means "change from bridleway to cyclist/pedestrian use only" which is not my intention. I would just like to see the condition of the path improved.

I have contacted Luke Dawson to ask him whether the grass verges can be cut back to reveal the tarmac as much as possible (hopefully the whole width of the path). In addition to this, it would be good to have the worst of the potholes filled in and/or drainage improved. Potholes is perhaps not the best description as the uneven surface is worse than that. My blog includes photos of what the path can look like on a rainy day, so I'm hoping we can get this improved before the autumn/winter months roll in: http://thehatchespath.blogspot.co.uk/2014/05/background.html

My petition now has 113 signatures to date, so its gaining a lot of interest. I would like to post an update to my blog of your response on what the council can do to help. Ultimately I would like to know if you can provide financial support to the Countryside Access Team to carry out the improvements:
- if temporary improvements are made, do the CAT use their own funds for this (Luke Dawson did some investigation into this)
- what is the possibility of a fully resurfaced  Shared Use path? i.e.
   - is this something Andrew Milne could help with?
   - BTW, Nicola's email wasn't included in David's request below (to raise this with Andrew Milne). Is that something you could pursue?

Will you be sending out minutes of the meeting, or posting on-line?  Will this include your response to my question?
...to be continued in next update...

Tuesday, 24 June 2014

Surrey Heath Local Committee mtg: Thu 3rd July

Surrey Heath Local Committee meets every couple of months:

I intend to visit the next meeting on Thu 3rd July to raise a question about the Hatches. The following is my email correspondence, which I'll update as I get feedback.
Mon 23rd Jun (to: contact.centre@surreycc.gov.uk; cc: chris.pitt@surreycc.gov.uk)
I'd like to raise a question at the upcoming committee meeting:


Should I raise this on the day, or is it best to raise in advance to have it added to the agenda?

Basically, I just want to let the committee know about a petition I've started:
...to raise awareness of the need for improvements to the Hatches Path (officially known as Bridleway BW19).

I'm looking for support from the committee and a discussion on what steps we can take to have the path improved. Initially this could be temporary improvements to fix the worst potholes. Eventually it would be good to have the path upgraded to a "Shared Use route for pedestrians and cyclists".

The contact centre forwarded my email above to the SHLC, and I received the following:

Mon 23rd Jun (from nicola.thorntonbryar@surreycc.gov.uk: to: Jon McClelland, Chris Pitt <chris.pitt@surreycc.gov.uk>, David Ivison <david.ivison@surreycc.gov.uk> ; cc: "Milton, Bob" <bobmilton@kilnsidefarm.fsnet.co.uk>,"Beach, Mrs Diane" <chobhamchasers@hotmail.co.uk>, British Horse Society <enquiry@bhs.org.uk>
Just to confirm with you...  We will be receiving a Rights of Way report at the July committee on the Hatches Bridleway 19, to confirm the TRO to close the crossing to horses as follows:- 

Members will recall approving the publishing of an Intention to make a Traffic Regulation Order (TRO), under section 1 of the Road Traffic Regulation Act 1984, to prohibit horse use on Public Bridleway No. 19, Camberley and Frimley. No objections were received within the statutory advertising period. Members are asked to consider whether the legal and policy criteria for making the Order still apply.  It is recommended that a TRO be made for avoiding danger to persons or other traffic using the road, or for preventing the likelihood of any such danger arising. 

There are specific rules and regulations on objections to Rights of Way issues, but I understand that your enquiry is more with regard to the state of the pathway for pedestrians and not about use as a bridleway.   

We have a public question time prior to the official meeting (starting at 6pm) where any member of the public can come along and speak about any areas of concern or with regard to any item on the agenda.  You are most welcome to come along and raise awareness of your petition for pathway improvements and ask any questions. 

You have started an on-line petition on the Hatches bridleway - asking for improvements to be made.  The deadline date that you have set for your petition is 16th November 2014.  We will therefore table this petition to be discussed at DECEMBER committee meeting.  You have received 87 confirmed signatures to date.

...my highlighting above. I was confused by the wording of the email above so replied-all...
Mon 23rd Jun (reply-all to above)
Yes, to confirm, my petition is with regards to the state of the path for use by pedestrians & cyclists. I don't want to complicate this petition with the separate discussions on keeping it open as a bridleway.

I'm slightly confused by your email. Are you saying I shouldn't raise this issue at the JULY meeting next week? Do you want me to wait until the DEC mtg?  I would like to get the issue "on your radar" as soon as possible, with further updates in Dec when the petition closes. The petition has reached more that the required 30 signatures for it to be raised at a meeting, so I would like to proceed with raising this at next weeks meeting. Is that OK?

I also received this from Bob Milton...
Mon 23rd Jun (reply-all to above)
This situation is one of principle that the cyclists use the track as a result of the licensed use for cyclists under the 1968 Countryside Act and that use brings no duty to maintain the track for cyclists only pedestrians and equestrians and then only suitable for its use for the rights users ie pedestrians and equestrians.

The Railway Network operator wishes to save money and not put in fully useable safety systems so wishes to remove as of right equestrian use even though the present system has been unusable by equestrians for at least the last 20years so in a way has contributed to the displacement of equestrians from the grazing land between the two rail crossings. The Hampshire CC RoW TRO at Farnborough North was snuck in without BHS input.

If the Traffic Regulation Order banning equestrian access is made there is no other suitable crossing fromSurrey into Hampshire until you get to Tongham seven miles away. It will also mean that there is no duty to maintain the highway, for that is what the bridleway is, suitable for cyclists

I replied all with the following:
Mon 23rd Jun (reply-all to above)
Thanks Bob, I'm not against horses using this path/bridleway, but I'd like to concentrate on getting the path fixed. If horses want to use the nicely resurfaced path it's fine by me, but I'd like to get it fixed for pedestrians & cyclists as a priority - horses probably don't mind the state of the path as its stands.

Nicola, you say the public section of the meeting starts at 1800, before the official meeting at 1830. I'll be in London on a training course so may struggle to get there for 1800, but will do my best.

In the event I can't get there in time, I'd like the committee to kindly consider my question:

"The Hatches path, officially referred to as Bridleway BW19 by the Countryside Access Team, is long overdue maintenance. The path is overgrown on each side and is now a narrow strip of tarmac, much of which is badly potholed. In winter the path is muddy and flooded making it very difficult for pedestrians & cyclists to navigate.

Many people would like to see the path properly tarmacked across the full width of the path (approx 7-9 feet) and treated as a "Shared Use route for Pedestrians & Cyclists". I have started a blog and petition to raise awareness of this, which has 89 signatures to date. I expect more signatures as conditions get worse in the autumn.

I have been in correspondence with Luke Dawson of the Countryside Access Team who has visited the path and confirmed it needs maintenance work carried out. He has requested funds "from a bigger pot" to fund improvement works but was unsuccessful this year. He has investigated interim solutions to fix the worst of the potholes and improve drainage. He also suggested "a scrape of the surface mud to allow the full available width". I noticed this was done recently (by Mon 23rd June) but this has only cleared the existing 4 foot wide path. Potholes still need to be fixed and drainage improved.

So, my question to the committee is whether they can help the Countryside Access Team with funding to upgrade the path properly to a Shared use route for Pedestrians & Cyclists.

My blog has full details of my discussions with the Countryside Access Team and sustrans. I will also update with the committee's feedback. Thank you for your time".

To be continued. Please attend the committee meeting to show your support if possible.